Titan Cement ERP

The Future of Project-Driven Heavy Manufacturing. Transform your plant into a Dynamic Execution Engine with 100% operational transparency and real-time co-pilot intelligence.

Titan Cement ERP Hero

The Industry "Silo" Crisis

Traditional cement plants face a critical coordination gap that erodes margins.

Invisible Projects

Traditional ERPs track "Orders" but ignore the complex work required to fulfill them.

Inventory Blindness

Reactive procurement of Coal or Iron Ore leads to costly production halts.

Costing Vacuum

True costs are seen at month-end, too late for corrective efficiency measures.

Our Core Philosophy: Order-to-Project Transformation

Every bag of cement is tracked against a specific Sales Project ID. This shift transforms your plant from a static record-keeper into a Dynamic Execution Engine.

Zero Manual Follow-Up

Tasks find users; users don't find tasks.

Functional Core Architecture

A project-centric ecosystem of interconnected engines driving zero-lag execution.

Sales & CRM

Launches projects from orders. Real-time material checks and credit limits before commitment.

Material Planning

Deep industrial BOM-driven requirements. Auto-triggers PRs for clinker, coal, and gypsum.

MES & Production

Bridges SCADA to Business layer. Tracks Kiln feed rates, Mill TPH, and specific energy in real-time.

LIMS Quality

100% BIS compliance. Mandatory quality gates for 28-day strength and Batch release authorization.

Costing & BI Engine

Aggregates financial and operational data for real-time EBITDA visibility per project and plant unit.

  • kcal/kg Fuel Efficiency Tracking
  • kWh/t Specific Power Consumption
  • Real-Time EBITDA Per Batch
  • SLA Variance Per Department

The Titan Engine Matrix

A granular breakdown of the core industrial engines driving your enterprise.

Engine Primary Function Key Role Owner Strategic Impact
Finance & Credit Account Heads & Credit Limits CFO / Finance Head Automated Risk Control
Procurement BOM-Driven Auto-PRs Purchase Manager Zero Stock-out Assurance
Production Kiln & Mill MES Tracking Plant Planner Real-time Yield/TPH Monitoring
Quality (LIMS) BIS Compliance Gates Lab Technician 100% Authorized Release
Maintenance Asset Tree & PM Schedule Maint. Engineer 15% Reduced Unplanned Downtime
HR & Shift Skill Matrix & Shift Handover HR Head / Supervisor Safe, 24/7 Operational Governance

Asset Intelligence (Plant Tree)

We map your entire plant into a recursive hierarchy—from the Plant level down to specific components like Bearing Housings. The system tracks MTBF (Mean Time Between Failures) for every motor, enabling truly predictive maintenance.

Digital Shift Governance

Ensure 100% safety with integrated skill matrices. The system prevents "Shift Start" if a certified CCR Operator is not clocked in. Digital Handover logs ensure critical kiln fluctuations are never missed.

The 27-Activity Linear Journey

From Sales Order to GST Billing: An auto-orchestrated, zero-lag execution workflow.

Sales

Project Launch & Material Check

Finance

Credit Approval Gate

Production

Mill Scheduling & MES Logging

Quality

LIMS Testing & Batch Release

Logistics

Weighbridge & Gate Pass

Billing

E-Invoice & Revenue Recognition

SLA-Driven State Machine

Every project is broken down into exactly 27 standardized activities. If an activity reaches 70% of its SLA, it turns Orange. At 100%, it turns Red and auto-escalates to the Department Head.

Titan Workflow Engine

Industrial Integration Hub

Titan acts as an "Open Hub," ingesting data from every corner of your plant.

SCADA & PLC

Real-time ingestion via OPC-UA/MQTT for kiln and mill sensor data.

Weighbridge

Direct TCP integration captures weight readings directly, eliminating manual errors.

Govt & GST Portal

Native G2B integration for E-Way bills and E-Invoices triggered at exit.

Strategic Plant Metrics

Real-time industrial KPIs derived from live execution data.

~720

kcal/kg Heat Consumption

~85

kWh/t Specific Power

16.3%

Average Net Margin

91%

SLA Compliance Rate

Sample Case Study

Real outcomes from our latest industrial simulation.

Project: National Infrastructure Ltd

Bulk OPC 53 - 8,000 Tons

  • Duration: 44 Days (2 Days Ahead of Schedule)
  • Net Profit: $57,760
  • Margin: $7.22 / Ton
  • Compliance: 100% BIS Pass (40 Lab Logs)
AI ALERT Log

"Predictive Shortage Alert: Current coal consumption leads to Stock-out on Day 18. Suggest immediate PR."

Outcome: Procurement actioned on Day 12. Zero Downtime.

Operational AI Co-Pilot

Beyond automation: Decision Intelligence embedded into every role.

RAG Architecture

Retrieval-Augmented Generation connects our LLM to real-time industrial data: Workflow logs, Telemetry sensors, and Financial metrics.

  • Predictive Maintenance: MTBF radar for kiln/mill health. Predict failures before they stop production.
  • SLA Breach Forecasting: Monte Carlo simulations on active projects to flag 27-activity bottlenecks.
  • Natural Language Analytics (RAG): Query production logs and LIMS results in plain English.
  • Yield Optimization: AI suggestions for fuel-mix (AFR) and power efficiency.
Titan AI Intelligence
Phase 1

Natural Language Querying & Bottleneck Alerts

Phase 2

SLA Breach Forecasting & Demand Prediction

Phase 3

Fuel-Mix Optimization & Prescriptive Sourcing

Phase 4

Semi-Autonomous Workflows & Auto-Negotiation

Corporate Multi-Plant Intelligence

Consolidated visibility for the Group CFO and Plant Heads.

Multi-Unit Benchmarking

Compare performance KPIs across multiple plants in real-time. Identify efficiency variances in fuel consumption, power, and logistics costs per unit.

Group EBITDA Consolidation

One-click view of total group profitability, with the ability to drill down into specific projects or departmental bottlenecks at any location.

Titan Corporate intelligence

Implementation Roadmap

A proven 4-stage rollout strategy for rapid industrial transformation.

01

Discovery & Mapping

Master data cleanup and 27-activity workflow configuration.

02

Modular Pilot

Core Sales, Finance, and Inventory go-live on Line-1.

03

AI Integration

Deployment of Predictive Maintenance and SLA-Breach engines.

04

Group Rollout

Full-scale deployment across multiple units with BI consolidation.

Projected 15% EBITDA Growth within 18 Months

Join the leaders in project-driven heavy manufacturing.

Start Your Transformation